H.V.A.C (Heating, Ventilation & Air Conditioning)
Designing on software based Calculation.
Duration: 2 Months Class: 02hrs daily.
GENERAL INTRODUCTION AND APPLICATION OF AIR CONDITIONINGS SYSTEMS
 |
Definition of air conditioning as per (ASHRAE) |
 |
Terms used in air conditioning and their definitions |
 |
Basic parts of air conditioning and refrigeration machines |
 |
Basic cycle and description of component of cycle. |
 |
Reading Psychometric charts |
 |
Software based calculations such as Zamil, E-20, |
 |
ASHRAE, TRANE, DUBAI, HEAT, LOAD, ElITE, CARRIER |
|
TYPES OF AIR CONDITIONINGS SYTEMS
 |
1) Window A/c 2) Split A/c 3) Package A/c 4) Central A/c |
 |
HVAC — Year round A/c (Air cooled chillers and water cooled chillers)
|
|
INTROCUCTION TO HEAT LOAD CALCULATIONS
 |
Modes of Heat Transfer. |
 |
Sources of Heat in Buildings.
|
 |
Calculation of co-efficient of heat transfer of various material such as Wall, Roof, Partition, Floor, Glass, Ceiling etc
with the help of annexure
|
 |
Calculation of temperature difference of Wall / Glass/
Roof / Partition etc.
|
 |
Filling of E-20 forms for heat load estimation using ASHRAE standard.
|
 |
Reading the civil drawing
|
 |
Project completion (Residential or commercial building)
|
|
SELECTION OF FAN COIL UNIT (FCU’S)
NOTE: - All machines are to be selected based on heat load calculations.
 |
Definition of fan coin units (FCU’s)
|
 |
Nomenclature of Fan coin units (FCU’s)
|
 |
Data required for the selection of (FCU’s)
|
 |
Location of (FCU’s)
|
|
SELECTION OF AIR HANDLING UNITS (AHU’S)
NOTE: All machines are to be selected based on Heat Load Calculations
 |
a) Air handling unit - Definition
|
 |
b) Types of AHU’s (Horizontal / Vertical)
|
 |
c) Difference between FCU and AHU
|
 |
d) Ventilation standards of Residential, Commercial, Hospital, Industrial Buildings
with respect to duct sizing methods ASHRAE Stds.
|
 |
e) Selection of AHU’S
Data Required for the selection of air handling unit (AHU’s).
Location of (AHU’s)
| |
SELECTION OF CHILLER’S
 |
a) Definition of Chiller’s and purpose.
|
 |
b) Types of Chiller’s (Air Cooled Chiller’s & Water cooled chiller’s)
|
 |
c) Selection of Chiller’s
|
 |
d) Data required for the selection of Chiller’s
|
 |
e) Location of Chiller’s
| |
ASSIGNEMENT:
 |
Preparation of Civil Drawings
|
 |
Location of machines on drawings.
|
 |
Location of chiller’s on Roof Top.
|
|
PIPE SIZING AND PUMP SELECTION
 |
a) Selection Drawings @ pump room
|
 |
b) Selection Drawings @ chiller’s
|
 |
c) introduction to various fittings associated with pump Chiller’s, (AHU’s), (FCU’s)
|
 |
d) Pipe sizing @ Roof, Floor, Risers, Pipe Materials
|
 |
e) Pump head calculations
| |
DUCT SIZING
 |
Duct definition and purpose
|
 |
Shape of the duct (Round / Rectangular)
|
 |
• Velocity Method
|
 |
• Equal Friction Method
|
 |
• Static Regain Method
|
 |
a) Aspect ratio (Width & Height)
|
 |
b) Duct sizing using DUCTULATOR / CHARTS / TABLES / SOFTWARES
|
 |
c) SINGLE LINE DIAGRAM PREPARATION
|
|
COST ESTIMATION METHOD
 |
a) Cost of the Machines
|
 |
b) Cost of the Chiller’s
|
 |
c) Cost of the Pipe’s
|
 |
d) Cost of the Duct (GI * SHEETS) etc.
|
|
|